


Listing Courtesy of: EMERALD COAST / Listed By: Steven Bradley, The Agency Northwest Florida Beaches; Jacquelyn S Wilbanks, The Agency NW Florida Beaches
1325 N 69th Avenue Pensacola, FL 32506
Active (8 Days)
$1,250,000 (USD)
5.16
ACRES
Description
MLS #:
1009249
1009249
Lot Size
5.16 acres
5.16 acres
Type
Land
Land
County
Escambia County
Escambia County
Listed By
Steven Bradley, The Agency Northwest Florida Beaches
Jacquelyn S Wilbanks, The Agency Northwest Florida Beaches
Jacquelyn S Wilbanks, The Agency Northwest Florida Beaches
Source
EMERALD COAST
Last checked Aug 14 2026 at 12:14 AM GMT+0000
EMERALD COAST
Last checked Aug 14 2026 at 12:14 AM GMT+0000
Bathroom Details
Subdivision
- Winston Place
Lot Information
- Cleared
- Survey Available
- Storm Sewer
Utility Information
- Utilities: None
School Information
- Elementary School: Myrtle Grove
- Middle School: Warrington
- High School: Escambia
Location
Estimated Monthly Mortgage Payment
*Based on Fixed Interest Rate withe a 30 year term, principal and interest only
Listing price
Down payment
%
Interest rate
%Mortgage calculator estimates are provided by The Agency and are intended for information use only. Your payments may be higher or lower and all loans are subject to credit approval.
Disclaimer: Information deemed reliable but not guaranteed. The information is provided exclusively for consumers personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. © 2026 Emerald Coast Association of REALTORS Last Updated: 8/13/26 17:14
Vendor Number:29098
Vendor Number:29098
Winston Place is engineered and site-planned for 25 duplexes -- 50 total units -- along N. 69th Avenue, with a
complete civil design package spanning utility, drainage, and landscape plans, ready to move through final
permitting.
The site carries an administrative variance from Escambia County allowing reduced 13-15 ft spacing between
duplex structures, increasing achievable density beyond standard code minimums. Zoning (MDR) and future
land use (MU-S) support the proposed use as-is. Full civil infrastructure is designed and ready for construction:
water and sanitary sewer service to each lot, fire hydrant coverage, and a stormwater management pond
serving the site. The water and sewer permit application has already been approved. The property sits in FEMA
Zone X / shaded X, outside the highest-risk flood designations.
The site previously held an approved development order, which has since expired; the owner will be
resubmitting for a new development order. Civil engineering is complete, giving a buyer a clear, already-
designed path through resubmittal and control over final permitting timing and any design refinements before
breaking ground.